Connect with us

TOP STORIES

Railway Safety Commissioner gives green signal to train ops on 17 km Katra-Reasi track | KNO

Published

on

kno news

Srinagar, Jan 15 (KNO): The dream of connecting Kashmir to Kanyakumari through railway is becoming a reality as Commissioner of Railway Safety (CRS) has authorised the opening of the newly constructed 17 km long Katra-Reasi rail track for public carriage of goods and passenger traffic, railway officials said. A seven-page authorisation letter by CRS Dinesh Chand Deshwal, a copy of which lies with news agency—Kashmir News Observer (KNO) give green signal for the opening of the newly constructed broad-gauge line between Katra and Reasi stations for public carriage of goods and passenger traffic This marks the completion of the entire Udhampur-Srinagar-Baramulla new broad-gauge rail link project in the Firozpur division of Northern railways. The CRS had inspected the newly constructed track in January this year by motor trolley, and on foot that was followed by a speed trial on the entire section from Katra to Banihal. The speed trial was conducted in both up and down directions, from Katra to Banihal and vice-versa, using an inspection special fitted with OMS equipment and hauled by electric locomotive. The speed during the trial was generally 110 km/h, with no peaks above 0.15g observed. "Based on completion documents and safety certificates, certifying satisfactory completion of works, and based on sample checks conducted during my inspection, I am of the opinion that the provisions for the opening of public carriage of goods and passenger traffic have been met." The CRS has authorised the regular opening of the section for public carriage of passengers and freight traffic at a maximum permissible speed of 85 km/h on the main line and 15 km/h on turnouts, with the authorisation subject to compliance with various conditions, guidelines, and stipulations. The railway will commence train operations shortly after the issuance of this authorisation, and the date of the introduction of passenger services shall be advised to the commission, the letter states. The work on the Udhampur-Srinagar-Baramulla rail project started in 2005-06. The 118-km-long Qazigund-Baramulla rail section in Kashmir was inaugurated in October 2009. The 18 km Banihal-Qazigund and 25 km Udhampur-Katra sections were commissioned in June 2013 and July 2014. The Sangaldan-Banihal section was completed last year and is now operational. The railway line to Kashmir has 38 tunnels with T-49 - measuring 12.75 km - being the country's longest rail tunnel. The line has 927 bridges. It includes the world's highest railway arch bridge over the Chenab river in the Reasi district, which sits at an elevation of 359 metres—(KNO)

Trending

TOP STORIES4 hours ago

NBT to implement Central schemes in J&K to enhance book library movement: Union Minister | KNO

TOP STORIES5 hours ago

CBK carries out searches in Anantnag, accused arrested in cheating case | KNO

TOP STORIES11 hours ago

Kulgam encounter: Terrorist killed, operation underway, says Army | KNO

TOP STORIES21 hours ago

Banks mulling package for revival of businesses affected by Pahalgam terror attack | KNO

TOP STORIES21 hours ago

Take a pledge to eliminate every terrorist, their outfits: LG Sinha to Army Officers | KNO

TOP STORIES21 hours ago

Indo-Pak relations strained after Pahalgam attack; ‘Op Sindoor' on: GoI | KNO

TOP STORIES21 hours ago

1200 kgs of decomposed meat seized, destroyed in Srinagar outskirts | KNO

TOP STORIES21 hours ago

Punjab Govt appoints Nodal Officers to ease cattle trade; Kashmir Mutton dealers call off strike | KNO

TOP STORIES21 hours ago

2nd Chinar book fest to start at SKICC tomorrow | KNO

TOP STORIES21 hours ago

Encounter underway in Kulgam woods | KNO

TOP STORIES21 hours ago

Sat Sharma invites HM Shah to visit J&K; lauds his strong leadership for combating terrorism | KNO

TOP STORIES21 hours ago

MBBS seats increased in J&K, Ladakh gets first Medical College: GoI | KNO

TOP STORIES21 hours ago

Ladakh’s legal infra expands slowly: GoI | KNO

TOP STORIES21 hours ago

Learning with Tech out of bounds for 64% JK students | KNO

TOP STORIES21 hours ago

3.8 lakh cases pending in J&K, Ladakh courts: Govt data | KNO

TOP STORIES21 hours ago

Only 4 FTSCs functioning in J&K: Centre | KNO

TOP STORIES21 hours ago

After 4 decades, KPs return to Wasak Nag Temple in Chadoora | KNO

Copyright © 2021